Location

1186
6,000
m

Distance to shore

9
10.27
km2

Area

122
128
MW

Plan Capacity

Details

  • Location: The coast of Miaoli County.
  • Distance to shore: 2~6 km
  • Area: 10.27 km2
  • Relevant sea depth: 15 ~30meters
  • Plan Capacity: 128 MW
  • Turbines:
    • – Phase I: 2 x 4 MW Siemens turbines
    • – Phase II: 20 x 6 MW Siemens turbines
  • Commercially operating date:
    • – Phase I: 2017/04
    • – Phase II: Expected by end of 2019
Formosa I 128MW will be able to meet the needs of around 128,000 homes per year. Over the lifetime of the Daan park, we will offset over 236 million tons of CO2 from being introduced into the atmosphere, making a significant contribution to the sustainability targets of Taiwan.