Location

4779
6,000
m

Distance to shore

8
10.27
km2

Area

126
128
MW

Plan Capacity

Details

  • Location: The coast of Miaoli County.
  • Distance to shore: 2~6 km
  • Area: 10.27 km2
  • Relevant sea depth: 15 ~30 meters
  • Total Installed Capacity: 128 MW
  • Turbines:
    • – Phase I: 2 x 4 MW Siemens turbines
    • – Phase II: 20 x 6 MW Siemens turbines
  • Commercially operating date:
    • – Phase I: 2017/04
    • – Phase II: 2019/12
Formosa I 128MW will be able to meet the needs of around 128,000 homes per year. Over the lifetime of the Daan park, we will offset over 245 million tons of CO2 from being introduced into the atmosphere, making a significant contribution to the sustainability targets of Taiwan.